1. Any steel reinforcement exposed in the course of getting rid of unsound elements shall be cleaned and well prepared in accordance with the above mentioned technical specs. Ahead of inserting patch, extra drinking water shall be blown, vacuumed or normally faraway from the surface, leaving the area damp https://www.pinterest.com/BKConcreteExperts/